facility management software in Kenya starts with one building and one work queue. In a Kileleshwa block of 84 units, a stalled lift is usually four hours of unrecorded phone calls.
The caretaker calls the plumber. The plumber calls the manager. The manager calls the chairman, who is in a meeting in Upper Hill and cannot remember which pump failed last time.
Every one of those calls is a small failure of memory. facility management software in Kenya replaces the chain with a ticket, a name, and a timestamp that survives the weekend.
Why a Single Work Queue Beats Five WhatsApp Groups
Five WhatsApp groups is not a system. It is five places where the same broken pump can be discussed and then forgotten.
A single queue puts every request into one list that a supervisor can sort by building, trade, and age. Nothing depends on who remembered to forward a message.
The caretaker at a Nyali apartment block logs a leaking riser at 07:40. By 08:05 the plumber has it on a phone, with the block name and the unit above the stain.
Nothing is lost in a group chat where a photo of a burst pipe sits between a birthday message and a notice about garbage collection. facility management software in Kenya keeps the pipe and the photo together.
A queue also assigns ownership. An unassigned ticket is a complaint, while an assigned ticket is a job with someone’s name beside it and a clock running.
Managers who run six sites need to see the whole portfolio at once, not six separate chat histories. facility management software in Kenya gives them that single view without asking anyone to compile a report.
The list should show the oldest open item first, because the oldest item is the one that becomes a legal letter.
When a director asks what happened to the roof leak reported in March, the answer should be a record and a closure photo. facility management software in Kenya keeps both attached to the job rather than to a departed manager’s phone.
One queue also means one numbering system, so a job can be quoted, invoiced, and defended months later.
The Asset Register as the Building’s Memory
A building is a collection of machines that quietly age at different rates. Nobody notices until two of them fail in the same week.
The lift in a Kilimani tower has a service life of about 20 years, the booster pump closer to eight, and the generator may outlast both if the alternator is looked after.
facility management software in Kenya keeps that collection in one register: make, model, serial number, installation date, warranty, and service history.
Without a register, maintenance becomes guesswork dressed as experience. Two managers will give you two different answers about the age of the same pump.
A borehole pump in Ruaka fails at 11 pm and the standby contractor asks for the head and flow. The register answers in seconds instead of a morning.
Serial numbers matter more than most managers admit. Two identical pumps in the same plant room can carry different impellers and different seal kits. facility management software in Kenya holds the serial against that service history.
The register should also record where the spare is kept, because the spare is often in a different building and sometimes in a different county.
Each asset should be linked to the work orders raised against it, so the true cost of a chiller emerges as a number rather than a feeling.
Assets are retired, not deleted. facility management software in Kenya keeps a removed generator on file because it still explains why the fuel line was rerouted in 2019.
Planned Maintenance Starts With a Calendar, Not a Crisis
Reactive maintenance feels productive because somebody is always rushing somewhere with a toolbox.
Planned maintenance feels slow right up to the month when nothing breaks and the phone stays quiet.
A preventive schedule is a list of tasks with frequencies attached: weekly, monthly, quarterly, annual. It is dull, and dull is the point.
facility management software in Kenya turns that list into dated work orders that appear before the due date, not after the failure.
The generator in a Donholm block needs a load test every month and an oil change every 250 running hours. Both are calendar facts rather than opinions.
Schedules should be tied to the asset, not to the building’s general to-do list. facility management software in Kenya keeps the pump’s tasks with the pump, even when the plant room is reorganised.
When a task is skipped, the reason should be recorded. A note saying there was no access to the plant room is a finding that a director needs to see.
Compliance tasks belong in the same calendar as the plumbing. Separating them is how a fire certificate expires while everyone is watching the leak.
A schedule that nobody can print is a schedule nobody follows, so the weekly sheet still matters alongside the phone. facility management software in Kenya generates that sheet from the same data the technicians update on site.
Writing a PPM Schedule a Technician Can Follow
A planned preventive maintenance task must be specific enough that two different technicians produce the same result.
“Check the pump” is not a task. “Record suction and discharge pressure, inspect the mechanical seal, and clean the strainer” is a task.
facility management software in Kenya stores task templates with the checks, the tools required, and the expected readings for each asset type.
Readings are the difference between maintenance and housekeeping. A bearing temperature of 78°C means something, while a note saying the machine seems fine means nothing.
Each task should carry a time estimate, because labour is the largest cost in a maintenance budget after spares. facility management software in Kenya uses that estimate to plan the week and to price contract work.
Photos taken before and after the work settle arguments with contractors and with owners who inspect the plant room once a year.
The template should also say what to do when a reading falls outside range: isolate, report, and raise a follow-up ticket with the supervisor copied.
Technicians who are given a clear checklist stop improvising, and improvisation is where most repeat failures begin. facility management software in Kenya makes the checklist part of the job card rather than a laminated sheet on the wall.
A good schedule survives staff turnover because the knowledge sits in the task, not in one man’s head.
Work Orders and the Four-Level Priority Ladder
Not every fault deserves a night callout, and treating them all the same is how a maintenance team burns out in a year.
Four levels are enough: emergency, urgent, routine, and planned. Each one needs a clear definition that everyone in the building understands. facility management software in Kenya makes those definitions visible on every ticket.
An emergency is a lift entrapment, a burst main, or a live electrical fault. Somebody responds within the hour, whatever the hour is.
Urgent means the building still works but badly: one of two pumps down, a gate motor failing, or a leaking roof above a tenant’s bed.
facility management software in Kenya stamps each level with its own response and resolution target, so the clock starts when the tenant reports rather than when the plumber remembers.
Routine covers the dripping tap and the flickering corridor light. These should be batched by floor so a single trip fixes six small things.
Planned work is the PPM calendar, and it should never be squeezed out by routine tickets. When it is, the following quarter pays for it.
Priority is set by impact, not by who shouted loudest. A chairman’s broken office door is not more urgent than a blocked sewer serving thirty flats.
The ladder only works if the levels are written down and applied the same way in every building of the portfolio.
Assigning Contractors Without Losing the Paper Trail
Most buildings use a mix of in-house staff and specialist contractors, and the handoff between them is where accountability leaks.
A lift needs the lift company. A generator needs an electrician who knows the alternator, not a general handyman with a multimeter and confidence.
facility management software in Kenya holds a contractor register with trade, licence, insurance cover, and the rate agreed for each task type.
Assignment should be a deliberate act with a name and a time attached, not a phone call that leaves no trace beyond a memory.
The contractor needs enough information to arrive prepared: access arrangements, the plant room key, and the fault history for that asset. facility management software in Kenya sends all three with the job.
A job card that travels with the contractor and comes back signed is still the most reliable proof that somebody actually attended.
When the same contractor is called three times for the same fault, the system should make that pattern visible before the fourth call is made.
Payment should follow closure, not attendance. facility management software in Kenya links the invoice to the signed job card so a contractor cannot bill for a visit that never happened.
The register also protects the manager when a contractor’s insurance turns out to have lapsed in January.
Service Level Agreements Measured in Hours, Not Promises
A service level agreement is only real when it produces a number that somebody reviews every month.
“Prompt response” is not a service level. “On site within four hours for urgent faults, resolved within 24 hours” is a service level.
facility management software in Kenya records the agreed targets per trade and per priority, then measures every job against the clock without anyone compiling a spreadsheet.
The measurement should be automatic, because manual service level reporting is always a little flattering to the reporter.
A lift contractor at 92 per cent on-time attendance looks good until you see that the missing 8 per cent were all entrapments.
Penalties and service credits should be written into the contract and applied without argument. facility management software in Kenya makes that easier because both sides see the same ticket history.
Quarterly reviews work better than monthly ones for specialist trades, since a single bad month is often a spare part stuck at the port.
The conversation changes when both sides are looking at the same evidence instead of exchanging versions of events. facility management software in Kenya keeps that evidence in one shared record.
Buildings that measure contractors tend to keep the good ones longer, because the good ones can prove their value with data.
Emergency Callouts and the Two-Minute Log
At two in the morning, the only things that matter are who is awake and what they were told.
An emergency log should take less than two minutes to complete: caller, unit, fault, time, and the person dispatched.
facility management software in Kenya lets a security guard raise the ticket from a phone without waking the manager for a tripped breaker.
The guard’s report is often the most accurate account, because the guard is the only person actually standing in the flooded lobby at that hour.
Escalation rules should be automatic. If nobody accepts the job within 15 minutes, the next person on the list gets it, and then the one after that.
Callout costs should be captured at the point of dispatch, including mileage, after-hours rates, and the parts used. facility management software in Kenya adds those costs to the building’s running total the same night.
Owners remember the night the water came through the ceiling. They also remember whether anyone answered the phone. facility management software in Kenya records the answer, and the time it took.
Every emergency should generate a short incident note the next morning, written while the detail is still fresh and the guard is still on shift.
Patterns hide in callouts. Six after-hours lift rescues in one month is a maintenance problem, not bad luck.
Response Time and the Difference Between Fast and Fixed
Response time is how long until someone arrives. Resolution time is how long until the problem actually stops.
Managers often report the first and quietly ignore the second, which is why tenants and managers sometimes describe the same week very differently.
facility management software in Kenya tracks both, with a pause only where the delay is genuinely outside the contractor’s control, such as a part shipped from Mombasa Road.
A first-time fix rate tells you whether the team is diagnosing or guessing. A low rate is expensive even when the response times look excellent.
The two numbers should be reviewed together, because fast attendance with slow repair is an expensive habit to build.
Tenants judge the whole service by the second number, and they are right to. They do not care who arrived first if the tap still drips.
Benchmarks help: a routine plumbing fault resolved in 48 hours is reasonable, while a lift out of service for a week is not.
Reporting should separate buildings, trades, and contractors so the weak link is obvious without a long investigation. facility management software in Kenya does that split automatically each month.
The point is not to rank people. It is to find the pump that keeps failing and replace it before it fails again.
Lifts: The Most Expensive Asset in the Block
A lift carries the highest maintenance cost per unit in most Nairobi apartment blocks, and the least tolerance for neglect.
The statutory inspection is annual, but the real work happens monthly in the machine room and weekly at the door tracks.
facility management software in Kenya holds the lift’s service history, the examiner’s certificate, and the date the next inspection falls due.
Door faults account for most callouts, and they are usually caused by misalignment rather than electronics. A door that closes slowly is a warning.
Ride quality is data. A noisy guide shoe or a jerky stop is a reading to be logged, not a complaint to be absorbed.
When a lift is out, the building’s whole circulation changes, and the queue at the single working lift becomes a tenant relations problem. facility management software in Kenya shows which floors are affected and who has been notified.
Modern controllers log faults internally. Somebody should download that log monthly instead of waiting for a breakdown to reveal it.
Spare parts for older lifts can take weeks to arrive, so critical items belong in the stores budget and the sinking fund plan.
A lift replacement is a capital project, and the fund should be told years in advance rather than at the point of failure. facility management software in Kenya tracks the remaining service life.
Pumps, Boreholes and the Cost of Dry Taps
Water is the fault that tenants notice fastest and forgive least, especially on the fourth floor of a walk-up.
A borehole in Kitengela may run for years and then fail within a week, usually because the pump is cycling too often.
facility management software in Kenya records pump run hours, pressure settings, and the yield test results from the last survey.
Booster pumps fail quietly. The first sign is often a tenant complaining about pressure rather than a technician noticing a gauge.
Tank levels should be monitored, because a refill at three in the morning costs less than an emergency tanker at noon. facility management software in Kenya logs the level every hour.
Water quality testing belongs on the schedule, especially where the borehole feeds a school, a clinic, or a restaurant kitchen. facility management software in Kenya keeps the lab results beside the asset so the paper trail is never in dispute.
The cost per cubic metre from a borehole is easy to calculate once electricity, maintenance, and testing sit in one place.
When a county supply bill arrives with an unexplained jump, the meter readings in the system are the first line of defence.
Dry taps produce more complaints than any other fault, and most of them are preventable with a working pressure gauge.
Generators, Fuel Logs and the Sunday Night Failure
A standby generator is judged on the one night it is needed, and that night is usually a Sunday with a big match on television.
Fuel is the easiest place for money to disappear in a building, so the log has to be tight and visible.
facility management software in Kenya records every delivery, every run hour, and the dip reading before and after each fill.
A generator that runs for 40 hours a month is either carrying too much load or has a changeover fault worth investigating.
Battery condition is the most common cause of a generator that will not start, and batteries fail silently between tests.
Load tests should be scheduled rather than improvised during a blackout. facility management software in Kenya puts the test on the calendar with the expected readings attached.
Exhaust, cooling, and fuel-line checks belong in the same monthly visit as the oil change, because the visit costs the same either way.
Fuel reconciliation should be a monthly report, not an annual surprise discovered during an audit. facility management software in Kenya produces it from the dip readings.
The building that tests its generator on the first Tuesday of every month tends to be the one that stays lit.
Compliance Certificates with Expiry Dates That Bite
A compliance file is a set of dates, and every date is a deadline that can close a building or stop a sale.
Fire certificates, lift inspections, electrical safety audits, water quality results, and public liability cover all expire quietly in the background.
facility management software in Kenya stores the certificate, the issuing body, and the expiry date, then raises a reminder 60 days out.
Sixty days is enough to book an inspection in Nairobi. Two weeks is not, and the difference is usually a cancelled function.
County inspectors do not accept a promise that the certificate is at the auditor’s office. They want the number and the date.
Compliance evidence should be attached to the asset it covers, so a new manager can find the lift certificate without calling three former colleagues.
Insurance renewals deserve the same treatment, because a lapsed policy is always discovered at the worst possible moment. facility management software in Kenya puts both dates on one compliance dashboard.
Some certificates depend on others, since a fire certificate may require proof that the pump was tested and the hose reel serviced.
The file should be auditable in an afternoon, not reconstructed over a week of phone calls.
Cost Per Building When One Manager Runs Six Sites
A portfolio hides its problems in averages. One cheap building can make three expensive ones look respectable.
A manager running six buildings in Nairobi can appear efficient overall while one site quietly loses money every single month.
facility management software in Kenya allocates every work order, part, and contractor invoice to a specific building and a specific cost line.
Cost per unit per month is the number that makes comparison honest across blocks of different sizes.
Two similar blocks in Kahawa and Langata can differ by 40 per cent, and the reason is usually water losses or security labour.
Shared services such as a roaming plumber need an allocation rule, or one building quietly subsidises another for years. facility management software in Kenya applies the rule at the point of billing.
Capital items should be separated from running costs, because a pump replacement is not a maintenance trend and should not distort the average.
The report should show cost per building, per unit, and per square metre, since owners and directors ask different questions.
Directors argue about money, and the argument gets shorter when every shilling has an address.
Spare Parts, Stores and the Van That Never Has the Filter
Most delays are not caused by a lack of skill. They are caused by a part sitting in a store that nobody can find.
A stores ledger should list what is held, where it is, and the minimum level that triggers a reorder before the shelf is empty.
facility management software in Kenya links each part to the asset it fits, so a technician knows that filter belongs to the generator in Block B.
Consumables disappear quietly: lamps, fuses, tap washers, cleaning chemicals, and the occasional padlock.
Issuing a part against a work order creates a cost trail that a stores book never does, and the trail survives an audit.
Critical spares for lifts and pumps should be identified before a failure, not after three weeks without a lift. facility management software in Kenya flags those items on the asset record so the store knows what to hold.
A small store in each building sounds convenient until you find three half-used boxes of the same gasket.
Stock counts should be quarterly, and the variance explained rather than written off as shrinkage. facility management software in Kenya prints a count sheet per store.
The van that never has the filter is usually a symptom of a store that never had a reorder point.
Handover Between Shifts and the Night Report
Buildings run around the clock, but managers usually work eight hours and sleep through the interesting part.
The gap between the day team and the night team is where small faults become morning emergencies.
facility management software in Kenya carries an open-items list that the night guard and the day supervisor both see at handover.
A night report should be three things: what happened, what is still open, and what needs a decision before noon.
Security incidents, water levels, generator runs, and access problems all belong in it, even when nothing dramatic occurred.
Verbal handover fails because the person receiving it is tired and the person giving it wants to go home.
A written handover also protects the guard who reported a fault that nobody acted on. facility management software in Kenya timestamps the report, so the sequence of events is never in doubt.
Escalation contacts should be visible at the guard post, with names and numbers that are current this month. facility management software in Kenya updates them when a manager changes.
Buildings with clean handovers tend to have fewer six o’clock surprises and calmer Monday meetings.
Tenant Complaints as Maintenance Data
A complaint is a data point that arrives with emotion attached, and the emotion often hides the useful part.
The same damp patch reported by four tenants in one stack is not four complaints. It is one roof or one riser with a single cause.
facility management software in Kenya groups tickets by location and fault type so patterns surface before the ceiling collapses.
Complaint volume by building is a decent proxy for how well the asset is being run, and it costs nothing extra to collect.
Closing a ticket should require a note and, where relevant, a photo. A closed ticket with no detail is a rework waiting to happen.
Response messages to tenants reduce repeat calls, even when the fix is still pending and the part is still in transit.
Tenants who can see a ticket number behave differently from tenants who are told that somebody is following up. facility management software in Kenya gives them that number without a phone call to the office.
The monthly complaint summary should reach the committee, not sit in a manager’s inbox until the AGM.
Complaint data also feeds the budget, because the tap that fails twice a year eventually needs replacing rather than repairing.
The Monthly Building Report a Director Can Read
A director does not want 40 pages of tickets. A director wants to know what is working, what is failing, and what it cost.
One page is usually enough: open emergencies, overdue planned tasks, compliance dates within 90 days, and spend against budget.
facility management software in Kenya assembles that page from the same records the technicians use, so nobody rebuilds it by hand on the last Friday of the month.
Charts help, but a short list of named problems helps more. A director can act on a named pump and cannot act on a red bar.
The report should end with decisions required, not observations. Anything else is a newsletter.
A director who signs off a pump replacement in July is easier to work with than one who discovers it in December.
Reports should be comparable month to month, or nobody can see a trend and every meeting restarts the same argument.
When the same three items appear for three months running, the report is telling you that the management is the problem. facility management software in Kenya keeps that history, so the pattern is hard to deny.
The last page should list the newest asset register entries, because that is where next year’s costs are already visible.