{"id":4246,"date":"2026-11-10T15:22:06","date_gmt":"2026-11-10T15:22:06","guid":{"rendered":"https:\/\/pms.co.ke\/blog\/?p=4246"},"modified":"2026-11-10T15:22:06","modified_gmt":"2026-11-10T15:22:06","slug":"service-charge-software-in-kenya","status":"publish","type":"post","link":"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/","title":{"rendered":"Service Charge Software in Kenya: Budgets Owners Actually Read"},"content":{"rendered":"<p><a href=\"https:\/\/pms.co.ke\/blog\/landlord-tax-software-in-kenya\/more-properties-less-work\/#main\" rel=\"attachment wp-att-4177\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4177\" src=\"https:\/\/pms.co.ke\/blog\/wp-content\/uploads\/2026\/10\/More-Properties-Less-Work.png\" alt=\"Service Charge Software in Kenya\" width=\"1254\" height=\"1254\" srcset=\"https:\/\/pms.co.ke\/blog\/wp-content\/uploads\/2026\/10\/More-Properties-Less-Work.png 1254w, https:\/\/pms.co.ke\/blog\/wp-content\/uploads\/2026\/10\/More-Properties-Less-Work-300x300.png 300w, https:\/\/pms.co.ke\/blog\/wp-content\/uploads\/2026\/10\/More-Properties-Less-Work-1024x1024.png 1024w, https:\/\/pms.co.ke\/blog\/wp-content\/uploads\/2026\/10\/More-Properties-Less-Work-150x150.png 150w, https:\/\/pms.co.ke\/blog\/wp-content\/uploads\/2026\/10\/More-Properties-Less-Work-768x768.png 768w\" sizes=\"auto, (max-width: 1254px) 100vw, 1254px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/pms.co.ke\">service charge software in Kenya<\/a> exists because a budget nobody reads is a budget nobody pays for. In a South B block of 60 flats, the difference between 96 per cent collection and 61 per cent is usually one clear statement, sent on time.<\/p>\n<p>Owners do not refuse to pay service charge because they are mean. They refuse because the figure looks invented, the breakdown is missing, and the last three queries went unanswered.<\/p>\n<p><a href=\"https:\/\/zama.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> turns that suspicion into a document a treasurer can defend line by line, at any hour, without calling the accountant.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_90 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Why_the_Service_Charge_Budget_Fails_Before_It_Is_Approved\" >Why the Service Charge Budget Fails Before It Is Approved<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Unit_Factors_and_the_Arithmetic_Owners_Argue_About\" >Unit Factors and the Arithmetic Owners Argue About<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Building_the_Annual_Budget_Line_by_Line\" >Building the Annual Budget Line by Line<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Presenting_the_Budget_So_Owners_Read_Past_Page_One\" >Presenting the Budget So Owners Read Past Page One<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Invoicing_on_the_First_Not_the_Fifteenth\" >Invoicing on the First, Not the Fifteenth<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Collection_Rates_and_the_Arrears_Ageing_Report\" >Collection Rates and the Arrears Ageing Report<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Owner_Statements_That_Answer_the_Phone_Call_First\" >Owner Statements That Answer the Phone Call First<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Late_Payment_Interest_Without_Breaking_the_Relationship\" >Late Payment Interest Without Breaking the Relationship<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Variance_Reports_and_the_Line_That_Always_Overspends\" >Variance Reports and the Line That Always Overspends<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Utility_Recovery_and_the_Water_Bill_Nobody_Can_Explain\" >Utility Recovery and the Water Bill Nobody Can Explain<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Sinking_Fund_Contributions_That_Survive_a_Change_of_Committee\" >Sinking Fund Contributions That Survive a Change of Committee<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Reserve_Studies_and_the_Lift_That_Will_Need_Replacing\" >Reserve Studies and the Lift That Will Need Replacing<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Special_Levies_and_How_They_Differ_From_Service_Charge\" >Special Levies and How They Differ From Service Charge<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Preparing_the_File_for_the_Annual_Audit\" >Preparing the File for the Annual Audit<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Answering_Queries_at_the_AGM_With_Evidence\" >Answering Queries at the AGM With Evidence<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#Reconciling_M-PESA_Receipts_to_Units\" >Reconciling M-PESA Receipts to Units<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#What_a_New_Management_Company_Inherits\" >What a New Management Company Inherits<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/pms.co.ke\/blog\/service-charge-software-in-kenya\/#The_Year-End_Pack_That_Ends_the_Argument\" >The Year-End Pack That Ends the Argument<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Why_the_Service_Charge_Budget_Fails_Before_It_Is_Approved\"><\/span>Why the Service Charge Budget Fails Before It Is Approved<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Most budgets are defeated in the week before the AGM, not at the meeting itself.<\/p>\n<p>The committee circulates a single total, the owners compare it with last year, and the argument begins before anyone reaches page two.<\/p>\n<p>A budget that shows only a number invites the question of what the money buys. A budget that shows security, cleaning, water, insurance, and repairs separately invites a conversation instead.<\/p>\n<p><a href=\"https:\/\/dexa.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> builds the document from the same ledger that will later record the spending, so the plan and the actual sit side by side.<\/p>\n<p>The failure is often timing. A budget presented in December for a year starting in January gives owners no chance to query anything.<\/p>\n<p>Budgets should be drafted in September, discussed in October, and approved at a meeting with a quorum that was properly notified.<\/p>\n<p>When the notice goes out 21 days ahead with the draft attached, attendance improves and the meeting is shorter. <a href=\"https:\/\/pawa.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> sends the pack with the notice.<\/p>\n<p>The deeper problem is history. Owners who have never seen a variance report have no reason to trust a forecast.<\/p>\n<p><a href=\"https:\/\/pms.co.ke\">service charge software in Kenya<\/a> keeps three years of approved budgets and actuals in one place, which makes the new draft a continuation rather than a surprise.<\/p>\n<p>A budget also fails when it is copied from last year with a flat percentage added. Security costs do not move with inflation, and neither do lift contracts.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Unit_Factors_and_the_Arithmetic_Owners_Argue_About\"><\/span>Unit Factors and the Arithmetic Owners Argue About<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Service charge is not divided equally. It is divided by each unit&#8217;s share of the common property, and that share is where disputes live.<\/p>\n<p>Under the Sectional Properties Act, the unit factor is recorded in the sectional plan and registered against the unit. It is not a number the committee can adjust when a bill rises.<\/p>\n<p>A penthouse with a rooftop terrace and a ground-floor studio rarely carry the same factor, even when both hold two bedrooms.<\/p>\n<p><a href=\"https:\/\/estateadmin.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> stores the factor against the unit, so the apportionment is calculated rather than negotiated.<\/p>\n<p>The common mistake is applying equal shares because the spreadsheet is simpler. That decision is difficult to defend once an owner with a small unit reads the Act.<\/p>\n<p>Owners should be able to see their factor, the total of all factors, and the arithmetic that produced their monthly figure. <a href=\"https:\/\/churchesadmin.com\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> puts all three on the statement.<\/p>\n<p>When a block is extended or subdivided, the factors change. The register should record the date and the authority for that change.<\/p>\n<p><a href=\"https:\/\/vega.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> recalculates every affected unit from the new schedule and keeps the old one for the years already invoiced.<\/p>\n<p>A factor dispute at the AGM can stall the whole budget. Producing the sectional plan extract usually ends it in four minutes.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Building_the_Annual_Budget_Line_by_Line\"><\/span>Building the Annual Budget Line by Line<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A service charge budget is a list of contracts, salaries, and utilities with a date attached to each.<\/p>\n<p>Security is usually the largest line, followed by cleaning, water, electricity for common areas, insurance, and repairs.<\/p>\n<p>Each line needs an owner, a basis, and a monthly figure. &#8220;Repairs and maintenance&#8221; as a single line is an invitation to argue.<\/p>\n<p><a href=\"https:\/\/dereva.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> holds the budget by line and by month, so a contract that starts in March does not distort January.<\/p>\n<p>Salaries should include statutory deductions, uniform, and the cost of relief staff. A guard&#8217;s gross wage is not the cost of guarding.<\/p>\n<p>Insurance should be quoted for the coming year rather than escalated. Premiums move with claims history and with the sum insured. <a href=\"https:\/\/jaat.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> holds the quotation beside the line.<\/p>\n<p>Utilities deserve their own sub-lines, because a water bill that doubles in a dry season has a different cause from a lift contract that rises at renewal.<\/p>\n<p>Contingency should be visible and small. A 15 per cent contingency looks like padding, while 3 per cent with a clear rule for drawing on it looks like prudence.<\/p>\n<p><a href=\"https:\/\/wito.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> carries any unspent contingency into the following year&#8217;s budget as a named opening balance.<\/p>\n<p>The budget should also show the previous year&#8217;s actual beside each line. Owners compare, and it is better that they compare with the truth.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Presenting_the_Budget_So_Owners_Read_Past_Page_One\"><\/span>Presenting the Budget So Owners Read Past Page One<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A budget document competes with a WhatsApp forward about parking, and it usually loses.<\/p>\n<p>The first page should carry four things: the total, the change from last year, the monthly cost per unit, and the date of the meeting.<\/p>\n<p>If the monthly figure for a two-bedroom flat rises by KES 800, say so on page one. Owners who discover it on page nine arrive at the meeting angry.<\/p>\n<p>A short table of the ten largest lines is more persuasive than forty pages of detail, provided the detail exists behind it.<\/p>\n<p><a href=\"https:\/\/awasam.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> produces both views from one dataset, so the summary and the appendix never contradict each other.<\/p>\n<p>Charts help when they show a trend rather than a single bar. Three years of security costs tells a story that one year cannot.<\/p>\n<p>The document should be sent as a PDF that opens on a phone, because most owners will read it on a phone in traffic. <a href=\"https:\/\/saseni.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> publishes it to the owner portal.<\/p>\n<p>Queries should be invited with a deadline and a named person. Silence is not approval, and a meeting that assumes it is will be challenged later.<\/p>\n<p><a href=\"https:\/\/prim.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> logs every query against the budget line, so the treasurer can answer from a list instead of from memory.<\/p>\n<p>A budget that arrives with a covering note in plain English gets read. A budget that arrives as a spreadsheet attachment does not.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Invoicing_on_the_First_Not_the_Fifteenth\"><\/span>Invoicing on the First, Not the Fifteenth<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The date on the invoice matters more than most managers believe. A charge that arrives mid-month feels like an ambush.<\/p>\n<p>Invoices should be raised on the first working day, with the same reference format every month, and delivered before the fifth.<\/p>\n<p>Owners plan their month around known obligations. An invoice that appears on the 14th collides with school fees and rent.<\/p>\n<p><a href=\"https:\/\/rentaldesk.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> generates the monthly run from the approved budget and the unit register, then sends it by email and SMS in one action.<\/p>\n<p>The invoice should show the opening balance, the current charge, any payments received, and the closing balance. Four numbers, no ambiguity.<\/p>\n<p>Interest and penalties, where the by-laws allow them, should appear as separate lines rather than being folded into the charge.<\/p>\n<p>Part payments should be allocated to the oldest invoice first, unless the owner has specified otherwise in writing. <a href=\"https:\/\/fama.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> applies that rule automatically.<\/p>\n<p>Shared meters create their own invoice problem. A landlord who pays the whole water bill and recovers it from tenants needs a recovery line that reconciles to the utility bill.<\/p>\n<p><a href=\"https:\/\/spacekits.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> ties that recovery line to the meter readings for the period, so the total recovered never exceeds the total billed.<\/p>\n<p>A consistent invoice also trains behaviour. Owners learn that the first week is when the money moves.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Collection_Rates_and_the_Arrears_Ageing_Report\"><\/span>Collection Rates and the Arrears Ageing Report<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Collection rate is the single most useful number in a management company, and it is also the most easily flattered.<\/p>\n<p>A manager who reports 90 per cent collected may be counting a large payment that arrived in the last week of the year against a full year of charges.<\/p>\n<p>The honest measure is the ageing report: current, 30 days, 60 days, 90 days, and beyond 90.<\/p>\n<p><a href=\"https:\/\/zamacore.com\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> produces that report by building and by unit, with the oldest balance at the top.<\/p>\n<p>Arrears above 90 days deserve a different process from arrears at 30. One is a reminder, the other is a decision about legal action or a payment plan.<\/p>\n<p>Owners in genuine difficulty usually respond to a plan. Owners who are avoiding the office respond to a deadline and a copy of the by-laws.<\/p>\n<p>The report should separate disputed balances from undisputed ones, because a withheld payment over a leaking roof is not the same as a refusal.<\/p>\n<p><a href=\"https:\/\/mystayorbit.com\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> flags a unit as disputed with a reason and a date, so the collection team does not chase the wrong person.<\/p>\n<p>Vacant units owned by absent landlords are a recurring problem in Syokimau and Ruiru. Their arrears can quietly reach a year before anyone notices.<\/p>\n<p>The monthly arrears meeting should be short and end with five named actions, not a general appeal for owners to pay. <a href=\"https:\/\/dexa.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> prints the list before the meeting.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Owner_Statements_That_Answer_the_Phone_Call_First\"><\/span>Owner Statements That Answer the Phone Call First<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Most calls to a management office begin with a question the statement should have answered.<\/p>\n<p>An owner statement is not a receipt. It is a running account: charges, payments, adjustments, interest, and the balance carried forward.<\/p>\n<p>It should be issued monthly, even when there is no activity, because silence makes owners nervous. <a href=\"https:\/\/zama.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> sends it on the same day each month.<\/p>\n<p><a href=\"https:\/\/pawa.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> generates the statement from the same ledger as the invoice, so the two documents agree to the shilling.<\/p>\n<p>Any adjustment needs a narrative. A credit of KES 4,200 with no explanation will generate a call, and the call will cost more than the note would have.<\/p>\n<p>Statements should show the unit, the owner, the period, and the payment reference, so a query can be traced without opening three systems.<\/p>\n<p>When a unit is sold, the statement should close with a final balance and a handover note to the new owner.<\/p>\n<p><a href=\"https:\/\/pms.co.ke\">service charge software in Kenya<\/a> keeps the old owner&#8217;s history intact while starting a clean account for the buyer.<\/p>\n<p>Owners who receive a correct statement every month stop calling to check. That alone frees a manager for the work that actually needs a human.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Late_Payment_Interest_Without_Breaking_the_Relationship\"><\/span>Late Payment Interest Without Breaking the Relationship<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Interest is a by-law provision, not a punishment, and it should be applied the same way to everyone.<\/p>\n<p>The rate should be written in the by-laws, disclosed in the budget pack, and calculated from a stated due date.<\/p>\n<p>A common formulation is two per cent per month on balances older than 30 days, applied only after a written reminder.<\/p>\n<p><a href=\"https:\/\/estateadmin.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> calculates the interest daily and posts it as a separate line, so an owner can see exactly how the figure arose.<\/p>\n<p>The mistake is applying interest selectively. Waiving it for a friend of the chairman destroys the rule for everyone else.<\/p>\n<p>Equally, applying it to a disputed balance before the dispute is resolved turns a small argument into a legal one.<\/p>\n<p>A first-time late payment should usually attract a reminder and no interest. A second month attracts the charge, and the letter says why.<\/p>\n<p><a href=\"https:\/\/churchesadmin.com\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> holds the letter templates and the interest rule together, so the response is consistent rather than personal.<\/p>\n<p>Interest collected should be shown separately in the accounts. It is not service charge income, and mixing the two confuses the audit. <a href=\"https:\/\/vega.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> keeps it in its own ledger.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Variance_Reports_and_the_Line_That_Always_Overspends\"><\/span>Variance Reports and the Line That Always Overspends<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Every building has one line that overspends every year, and it is usually repairs.<\/p>\n<p>A variance report compares the approved budget with the actual for the period, in shillings and as a percentage. <a href=\"https:\/\/dereva.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> produces it at the close of every month.<\/p>\n<p>A 40 per cent overspend on a KES 50,000 line is less alarming than a 12 per cent overspend on a KES 4 million security contract.<\/p>\n<p><a href=\"https:\/\/jaat.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> sorts variances by value as well as percentage, so the material items come first.<\/p>\n<p>Explanations should be written at the point of the variance, not reconstructed at year end. A pump replacement in June is easy to explain in June.<\/p>\n<p>Some variances are timing. Insurance paid annually in January shows a huge variance in month one and none by December.<\/p>\n<p>The report should distinguish timing from genuine overspend, or the committee will spend every meeting on the same false alarm.<\/p>\n<p>Under-spending deserves attention too. A repairs budget that is never used may mean the building is not being maintained.<\/p>\n<p><a href=\"https:\/\/wito.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> flags any line below 50 per cent utilisation at the halfway point of the year.<\/p>\n<p>Variance reporting is the mechanism that makes next year&#8217;s budget credible, because it shows the committee learning from the last one.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Utility_Recovery_and_the_Water_Bill_Nobody_Can_Explain\"><\/span>Utility Recovery and the Water Bill Nobody Can Explain<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Water is the line that generates the most suspicion and the least evidence.<\/p>\n<p>A county bill arrives with a total, a meter number, and a period, and nothing that explains why it doubled in March.<\/p>\n<p>Recovery from tenants and owners should start with the master meter reading and end with the individual meter readings for the same dates.<\/p>\n<p>The gap between the two is the loss, and the loss has causes: leaks, bypasses, unmetered common areas, and occasionally a faulty meter.<\/p>\n<p><a href=\"https:\/\/awasam.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> records both readings and shows the loss as a percentage of the master meter, month by month.<\/p>\n<p>A loss above 15 per cent usually justifies a night survey, because that is when the leaks are running and nobody is watching.<\/p>\n<p>Electricity for common areas is simpler but not trivial. A lift, a pump, and corridor lighting can be sub-metered, which makes the recovery defensible.<\/p>\n<p>Where sub-metering is impossible, the recovery should be apportioned by unit factor and disclosed as an estimate. <a href=\"https:\/\/saseni.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> marks the line as estimated.<\/p>\n<p><a href=\"https:\/\/prim.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> labels estimated recoveries clearly, so nobody mistakes an apportionment for a meter reading.<\/p>\n<p>Garbage and security levies charged by the county should be tracked separately from service charge, because they are pass-through costs with their own receipts.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Sinking_Fund_Contributions_That_Survive_a_Change_of_Committee\"><\/span>Sinking Fund Contributions That Survive a Change of Committee<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A sinking fund is the only part of service charge that exists for a future owner&#8217;s benefit, which makes it easy to raid.<\/p>\n<p>Contributions should be a fixed percentage of the service charge, or a stated amount per unit factor, approved with the annual budget.<\/p>\n<p>The fund should sit in a separate bank account with its own signatories and its own ledger.<\/p>\n<p><a href=\"https:\/\/rentaldesk.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> tracks contributions, interest earned, and withdrawals against a schedule of intended works.<\/p>\n<p>A withdrawal should require a resolution, a quotation, and a note in the minutes. Without those three, the fund becomes a slush account. <a href=\"https:\/\/fama.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> records all three against the payment.<\/p>\n<p>Committees change, and a new treasurer often inherits a balance with no explanation of what it is for.<\/p>\n<p>The ledger should show the plan: roof in 2028, lift in 2031, perimeter wall in 2026. A fund with a plan is harder to spend on something else.<\/p>\n<p><a href=\"https:\/\/spacekits.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> links each contribution to the component it will eventually fund, so the balance has a purpose.<\/p>\n<p>Auditors increasingly ask for the sinking fund separately from operating accounts, and a clean ledger shortens that conversation.<\/p>\n<p>Owners sell flats, and a buyer will ask what the fund holds and what it is committed to. The answer should take one report.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Reserve_Studies_and_the_Lift_That_Will_Need_Replacing\"><\/span>Reserve Studies and the Lift That Will Need Replacing<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A reserve study is an inventory of the big components, their condition, their replacement cost, and their remaining life.<\/p>\n<p>It is not a maintenance plan. It is a financial plan that tells the committee how much to collect each month to avoid a special levy later.<\/p>\n<p>A lift in a 15-year-old Kilimani block may have eight years left. Replacing it in 2033 at today&#8217;s prices plus escalation is a number, not a rumour.<\/p>\n<p><a href=\"https:\/\/zamacore.com\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> links the asset register to the sinking fund schedule, so the remaining life and the balance move together.<\/p>\n<p>The study should use current contractor quotations rather than index figures, because lift prices in Nairobi have moved faster than inflation.<\/p>\n<p>Components below 30 per cent of remaining life should be flagged in the annual budget pack, even if no work is planned this year.<\/p>\n<p>A reserve study also protects the committee from accusations of hoarding. The fund has a schedule, and the schedule is available to every owner.<\/p>\n<p><a href=\"https:\/\/mystayorbit.com\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> shows the funding ratio: the balance against the amount the schedule says should be there by now.<\/p>\n<p>A building at 40 per cent funding is heading for a special levy, and the sooner owners see that, the gentler the levy will be.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Special_Levies_and_How_They_Differ_From_Service_Charge\"><\/span>Special Levies and How They Differ From Service Charge<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A special levy is a one-off charge for a specific project, and it should never be blended into the monthly service charge.<\/p>\n<p>The difference matters because a special levy needs its own resolution, its own quotation, and its own reporting. <a href=\"https:\/\/dexa.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> keeps the levy apart from the monthly run.<\/p>\n<p>A roof replacement or a new borehole is a capital project. Funding it from the monthly charge distorts both the budget and the cash flow.<\/p>\n<p><a href=\"https:\/\/zama.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> creates the levy as a separate account with a target amount and a collection deadline.<\/p>\n<p>Apportionment should follow the same unit factor as service charge unless the by-laws say otherwise, and the resolution should state which.<\/p>\n<p>Owners on payment plans should be visible in the levy report, because a levy that is 70 per cent collected cannot fund a contractor.<\/p>\n<p>The project account should close when the work is complete, with any surplus returned or credited according to the resolution.<\/p>\n<p><a href=\"https:\/\/pawa.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> produces a closing statement per levy, which is exactly what an owner asks for when the project ends.<\/p>\n<p>A levy that runs for three years without a closing statement becomes a permanent charge in everyone&#8217;s mind, and permanent charges are hard to remove.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Preparing_the_File_for_the_Annual_Audit\"><\/span>Preparing the File for the Annual Audit<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The audit begins months before the auditor arrives, and it begins with whether the ledger can be followed.<\/p>\n<p>An auditor will ask for the approved budget, the bank statements, the invoices above a threshold, the payment vouchers, and the minutes that authorised unusual spending.<\/p>\n<p>A ledger that ties every payment to an invoice and every invoice to a budget line answers most questions before they are asked.<\/p>\n<p><a href=\"https:\/\/pms.co.ke\">service charge software in Kenya<\/a> keeps the supporting document attached to the transaction, so the audit trail is a click rather than a filing cabinet.<\/p>\n<p>The common findings are predictable: unsupported payments, interest applied inconsistently, and sinking fund money used for operating costs.<\/p>\n<p>Bank reconciliations should be done monthly, not in a rush in February. An unreconciled account is an invitation to a qualified opinion.<\/p>\n<p>Petty cash is where small amounts vanish. An imprest system with receipts and a monthly count is enough to close that gap.<\/p>\n<p><a href=\"https:\/\/estateadmin.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> records the imprest holder, the float, and the receipts against each replenishment.<\/p>\n<p>The audit file should be assembled as the year runs, not after it ends. A folder per month is a simple discipline that saves a fortnight.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Answering_Queries_at_the_AGM_With_Evidence\"><\/span>Answering Queries at the AGM With Evidence<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>An AGM is a room full of owners with specific questions and a limited tolerance for vagueness.<\/p>\n<p>The treasurer who arrives with a printed variance report, a collection summary, and the sinking fund statement controls the meeting.<\/p>\n<p>The treasurer who arrives with a laptop and no printout spends the meeting scrolling while the room gets restless.<\/p>\n<p><a href=\"https:\/\/churchesadmin.com\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> produces a one-page summary per building that can be printed for every seat.<\/p>\n<p>Queries should be recorded with the name of the owner and the answer given, then followed up in writing within a week.<\/p>\n<p>A query that is answered but not recorded will be asked again next year, usually with more edge.<\/p>\n<p>The most common questions are predictable: why did security rise, why is the water bill so high, and who approved the roof repair.<\/p>\n<p>Having the answer in a report turns a confrontation into a review of a document that everyone can see.<\/p>\n<p><a href=\"https:\/\/vega.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> keeps the previous year&#8217;s AGM pack, so a question about a 2024 decision can be answered from the same screen.<\/p>\n<p>A short presentation with six slides beats a long one with forty, especially when the room is warm and the agenda is behind.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Reconciling_M-PESA_Receipts_to_Units\"><\/span>Reconciling M-PESA Receipts to Units<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>M-PESA is how most service charge is paid in Kenya, and it is also where reconciliation quietly breaks.<\/p>\n<p>A paybill receives a reference, but the reference is often a phone number, a unit number, or a random string typed by an owner in a hurry.<\/p>\n<p>Matching those payments by hand takes a bookkeeper two days at the start of every month, and the errors surface at the AGM.<\/p>\n<p><a href=\"https:\/\/dereva.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> matches the receipt to the unit using the reference, the phone number on record, and a rule for unmatched credits.<\/p>\n<p>Payments that cannot be matched should sit in a suspense account, not be posted to the nearest unit with a similar number.<\/p>\n<p>The owner should receive an SMS confirmation with the unit, the amount, and the new balance, because that message prevents most follow-up calls.<\/p>\n<p>Partial payments need a rule. Allocating to the oldest invoice is standard, but a payment marked for a specific levy should go there.<\/p>\n<p><a href=\"https:\/\/jaat.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> applies the rule and shows the allocation on the statement, so the owner can see where the money landed.<\/p>\n<p>Bank transfers and cheques still arrive, particularly from corporates and from diaspora owners, and they need the same discipline.<\/p>\n<p>Reconciliation should be daily, not monthly. A payment that sits unmatched for three weeks is a complaint waiting to be written.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_a_New_Management_Company_Inherits\"><\/span>What a New Management Company Inherits<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A change of management company is a handover of records, and the records are usually worse than the outgoing firm admits.<\/p>\n<p>The incoming team needs the unit register, the arrears report, the bank balances, the contracts, the asset register, and the open work orders.<\/p>\n<p>Without those, the first month is spent reconstructing history while owners watch and compare.<\/p>\n<p><a href=\"https:\/\/wito.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> makes the handover a data export rather than a boxes-of-files exercise.<\/p>\n<p>The arrears position is the most sensitive item. Every balance should be supported by invoices, payments, and any agreed plan.<\/p>\n<p>Contracts should be listed with start dates, end dates, and notice periods, because a lift contract with 90 days notice cannot be cancelled in a week.<\/p>\n<p>Sinking fund balances should be confirmed directly with the bank, not taken from a summary sheet.<\/p>\n<p><a href=\"https:\/\/awasam.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> records the opening balances with a handover date, so the new team&#8217;s reports start from a defensible point.<\/p>\n<p>A new manager who presents a clean opening statement in month one earns trust that takes others a year to build.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"The_Year-End_Pack_That_Ends_the_Argument\"><\/span>The Year-End Pack That Ends the Argument<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The year-end pack is the document that closes the loop between what was budgeted, what was spent, and what owners paid.<\/p>\n<p>It should contain the audited accounts, the variance report, the arrears summary, the sinking fund statement, and a short note on the year&#8217;s major works.<\/p>\n<p>It should also contain the following year&#8217;s budget, because owners read the two together whether or not the committee intends them to.<\/p>\n<p><a href=\"https:\/\/saseni.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> assembles the pack from the same ledger, so the numbers agree across every document.<\/p>\n<p>The note on major works matters more than the accounts for most owners. They want to know that the roof was fixed and the lift was serviced.<\/p>\n<p>Photographs of completed work belong in the pack. A before-and-after of the pump room does more for trust than a balance sheet.<\/p>\n<p>The pack should be sent with the AGM notice and posted to a location every owner can reach, including those abroad.<\/p>\n<p><a href=\"https:\/\/prim.co.ke\" target=\"_blank\" rel=\"noopener\">service charge software in Kenya<\/a> keeps the pack versioned, so the document discussed at the meeting is the document owners hold.<\/p>\n<p>When the pack is clear, the argument at the next AGM moves from suspicion to a decision about next year&#8217;s priorities, which is where it belongs.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>service charge software in Kenya exists because a budget nobody reads is a budget nobody pays for. In a South B block of 60 flats,&hellip;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,1],"tags":[],"class_list":["post-4246","post","type-post","status-publish","format-standard","hentry","category-rental","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/posts\/4246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/comments?post=4246"}],"version-history":[{"count":1,"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/posts\/4246\/revisions"}],"predecessor-version":[{"id":4249,"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/posts\/4246\/revisions\/4249"}],"wp:attachment":[{"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/media?parent=4246"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/categories?post=4246"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pms.co.ke\/blog\/wp-json\/wp\/v2\/tags?post=4246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}